ANNEXURE-2
QUESTIONNAIRE
FOR
IMPLEMENTATION OF
THE NATIONAL RURAL
EMPLOYMENT GUARANTEE ACT
1.A. Questionnaire for implementation of the National Rural
Employment Guarantee Act
(For the State / UT
Governments)
PLANNING
-
At present the District is
taken as a unit under the Act? There may be wide variations
within the districts. Should Block be taken as a unit? What
would be its implication?
-
Who has been designated as
the District Programme Coordinator? District Collector or
the CEO ZP?
-
How to integrate the
Planning process for NREGA with the District Planning
process as envisaged under the Article 243 7D of the
Constitution.
- What
should be the role of the intermediate level in the
implementation of the scheme? Should the gram panchayat be
made responsible for implementation of all works or should
the intermediate level also be given a role in
implementation of the Act?
- What
mechanism is suggested to bring about convergence between
the activities under other schemes like Bharat Nirman etc.
and NREGA?
- The
Gram Panchayat has been given the key role in implementation
of NREGA. The size and population of panchayats very widely
from State to State (or UTs) and also within a State (or
UT). Would it be desirable to group the smaller panchayats
into viable and administrative units for the purpose of this
Act?
- How to
ensure that the works included in the shelf of projects or
the once really needed for development of any particular
village? How to work out the priority between works?
IMPLEMENTATION
-
What mechanism of fund flow
would you suggest from the Central Govt. to the gram
panchayats in order to ensure smooth implementation of the
Act?
-
What steps would the State /
UT Government take to strengthen staff support to the gram
panchayats, in order to enable them to implement the Act?
-
Piece rate vs Time rate.
Which should be the preferred mode? What would be the
advantages and disadvantages of adopting each one of them?
-
What should be the mechanism
for payment of Unemployment allowance?
-
What checks and balances are
required if works are executed through the NGOs and SHGs.
-
How to ensure that the
District Schedule of rates is rationally prepared? Should
these be compared across districts in order to ensure
uniformity?
CAPACITY BUILDING
-
Capacity building would be
very critical for successful implementation of the scheme.
What is the road map the State / UT Government has laid for
this?
-
What should be the priority
areas for capacity building? How to prioritize persons in
the community for training purposes?
-
Who should conduct capacity
building exercise? Could NGOs be involved in this? Could
this be totally outsourced instead of being carried out by
the Government departments?
-
Should capacity building be
a one time intervention or a continuous process? In the long
run how to make capacity building a part of community
effort?
-
How should the awareness
generation campaigns be designed? Could this be entrusted to
professional agencies?
-
How should the success of
the capacity building effort be measured?
-
What should be the
ingredients of the training programme for the community?
-
What should be the
ingredients of the capacity building programme for the
Government functionaries?
MONITORING AND EVALUATION
-
What parameters should be
monitored at different levels?
-
Should there be a uniform
reporting system for the entire country? If so the
yardsticks and the broad framework may be suggested?
-
How to evaluate the outcome
of the implementation? What parameters/indicators should be
used?
-
How to involve citizens in
monitoring and evaluation?
-
Any other suggestion for
effective implementation of the scheme?
-
What mechanism is suggested
at the Central level to ensure proper utilization of funds
by the State / UT Governments? What mechanism is suggested
at the State / UT level to ensure proper utilization of
funds at the district level?
( Note-
the respondents may furnish any other pertinent
information/suggestion not included in the questionnaire)
1.B. Questionnaire for implementation of the National Rural
Employment Guarantee Act
(For the State / UT
Governments where panchayats have not been constituted)
PLANNING
-
At present the District is
taken as a unit under the Act? There may be wide variations
within the districts. Should Block be taken as a unit? What
would be its implication?
-
Who has been designated as
the District Programme Coordinator? District Collector or
the CEO ZP?
-
How to integrate the
Planning process for NREGA with the District Planning
process as envisaged under the Article 243 7D of the
Constitution.
- What
should be the role of the intermediate level in the
implementation of the scheme? Should the gram panchayat or
the village council be made responsible for implementation
of all works or should the intermediate level also be given
a role in implementation of the Act?
- What
mechanism is suggested to bring about convergence between
the activities under other schemes like Bharat Nirman etc.
and NREGA?
- The
Gram Panchayat has been given the key role in implementation
of NREGA. The size and population of panchayats very widely
from State to State (or UTs) and also within a State (or
UT). Would it be desirable to group the smaller panchayats
into viable and administrative units for the purpose of this
Act?
- How to
ensure that the works included in the shelf of projects or
the once really needed for development of any particular
village? How to work out the priority between works?
IMPLEMENTATION
-
What mechanism of fund flow
would you suggest from the Central Govt. to the village
councils in order to ensure smooth implementation of the
Act?
-
What steps would the
State/UT Government take to strengthen staff support to the
village councils, in order to enable them to implement the
Act?
-
Piece rate vs Time rate.
Which should be the preferred mode? What would be the
advantages and disadvantages of adopting each one of them?
-
What should be the mechanism
for payment of Unemployment allowance?
-
What checks and balances are
required if works are executed through the NGOs and SHGs.
-
How to ensure that the
District Schedule of rates is rationally prepared? Should
these be compared across districts in order to ensure
uniformity?
CAPACITY BUILDING
-
Capacity building would be
very critical for successful implementation of the scheme.
What is the road map the State /UT Government has laid for
this?
-
What should be the priority
areas for capacity building? How to prioritize persons in
the community for training purposes?
-
Who should conduct capacity
building exercise? Could NGOs be involved in this? Could
this be totally outsourced instead of being carried out by
the Government departments?
-
Should capacity building be
a one time intervention or a continuous process? In the long
run how to make capacity building a part of community
effort?
-
How should the awareness
generation campaigns be designed? Could this be entrusted to
professional agencies?
-
How should the success of
the capacity building effort be measured?
-
What should be the
ingredients of the training programme for the community?
-
What should be the
ingredients of the capacity building programme for the
Government functionaries?
MONITORING AND EVALUATION
-
What parameters should be
monitored at different levels?
-
Should there be a uniform
reporting system for the entire country? If so the
yardsticks and the broad framework may be suggested?
-
How to evaluate the outcome
of the implementation? What parameters/indicators should be
used?
-
How to involve citizens in
monitoring and evaluation?
-
Any other suggestion for
effective implementation of the scheme?
-
What mechanism is suggested
at the Central level to ensure proper utilization of funds
by the State / UT Governments? What mechanism is suggested
at the State / UT level to ensure proper utilization of
funds at the district level?
( Note-
the respondents may furnish any other pertinent
information/suggestion not included in the questionnaire)
2. Questionnaire for
implementation of the National Rural Employment Guarantee Act
(For the President Zila
Panchayats)
PLANNING
-
Should the unit of selection
for the implementation of NREGA be a district or a Block?
-
So far most of the schemes
were being implemented by the District Panchayat or the
intermediate panchayat. Under NREGA most of the works have
to be implemented by the gram panchayats. What problems do
you foresee in this? What are your suggestions to overcome
these problems?
-
What is the nature of works
that should be taken up under NREGA?
-
How to integrate the
Planning process for NREGA with the District Planning
process as envisaged under the Article 243 7D of the
Constitution.
-
What should be the role of
the intermediate level in the implementation of the scheme?
Should the gram panchayat be made responsible for
implementation of all works or should the intermediate level
also be given a role in implementation of the Act?
- What
mechanism is suggested to bring about convergence between
the activities under other schemes like Bharat Nirman etc.
and NREGA?
- The
Gram Panchayat has been given the key role in implementation
of NREGA. The size and population of panchayats very widely
from State to State (or UTs) and also within a State (or
UT). Would it be desirable to group the smaller panchayats
into viable and administrative units for the purpose of this
Act?
- How to
ensure that the works included in the shelf of projects or
the once really needed for development of any particular
village? How to work out the priority between works?
IMPLEMENTATION
-
How to ensure that the
selection of eligible persons is fair and doesn’t favour the
influential persons?
-
What checks and balances are
required if works are executed through the NGOs and SHGs.
-
How to ensure that the
District Schedule of rates is rationally prepared? Should
these be compared across districts?
-
How to ensure quality of
works executed?
-
What would be the best mode
of payment to the persons employed? Through cheque,
adjustment in accounts or cash?
CAPACITY
BUILDING
-
Are all elected members of
the panchayats aware about the provisions of the Act?
-
What should be done to make
people aware about their rights under the Act?
-
What should be the priority
areas for capacity building? How to prioritize persons in
the community for training purposes?
-
Who should conduct capacity
building exercise? Could NGOs be involved in this? Could
this be totally outsourced instead of being carried out by
the Government departments?
-
Should capacity building be
a one time intervention or a continuous process? In the long
run how to make capacity building a part of community
effort?
-
How should the awareness
generation campaigns be designed? Could this be entrusted to
professional agencies?
-
How should the success of
the capacity building effort be measured?
-
What should be the
ingredients of the training programme for the community?
-
What should be the
ingredients of the capacity building programme for the
Government functionaries?
MONITORING AND EVALUATION
-
What aspects should be
monitored by the gram panchayats, intermediate panchayats
and by the district panchayats?
-
Should there be a uniform
reporting system for the entire country? If so the
yardsticks and the broad framework may be suggested?
-
How to evaluate the outcome
of the implementation? What parameters/indicators should be
used?
-
How to involve citizens in
monitoring and evaluation?
-
Any other suggestion for
effective implementation of the scheme?
-
What mechanism is suggested
at the Central level to ensure proper utilization of funds
by the State / UT Governments? What mechanism is suggested
at the State / UT level to ensure proper utilization of
funds at the district level?
( Note-
the respondents may furnish any other pertinent
information/suggestion not included in the questionnaire)
3. Questionnaire for implementation of the National Rural
Employment Guarantee Act
(For the CEO Zila Panchayats)
PLANNING
-
Should the unit of selection
for the implementation of NREGA be a district or a Block?
-
Please furnish information
about your district in the following format:
Name of
District: Total rural population:
|
S.No. |
Name of Block |
No. of gram panchayats |
No. of gram panchayats
havings banks |
No. of gram panchayats
having a post office |
No. of gram panchayats
having internet connectivity |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
-
Which are the schemes being
implemented by the gram panchayats? {Implementation means
full implementation i.e. identification of works,
preparation of estimates, maintenance of muster rolls and
measurement book, and payment to the workers}.
-
How to integrate the
Planning process for NREGA with the District Planning
process as envisaged under the Article 243 7D of the
Constitution.
-
Do the gram panchayats have
qualified accountants and engineers? If not how are the
accounts kept by the panchayats, and how are estimates
prepared and works executed by the gram panchayats?
-
Is the problem of rural
unemployment uniformly spread throughout the district or is
it more pronounced in some blocks? Is this problem seasonal
or throughout the year?
-
NREGA is a demand driven
scheme. What would you suggest to generate awareness about
the ‘Right to work’?
- What
should be the role of the intermediate level in the
implementation of the scheme? Should the gram panchayat be
made responsible for implementation of all works or should
the intermediate level also be given a role in
implementation of the Act?
- What
mechanism is suggested to bring about convergence between
the activities under other schemes like Bharat Nirman etc.
and NREGA?
- The
Gram Panchayat has been given the key role in implementation
of NREGA. The size and population of panchayats very widely
from State to State (or UTs) and also within a State (or
UT). Would it be desirable to group the smaller panchayats
into viable and administrative units for the purpose of this
Act?
- How to
ensure that the works included in the shelf of projects or
the once really needed for development of any particular
village? How to work out the priority between works?
IMPLEMENTATION
-
Should there be a household
identity card or individual identity card for the eligible
workers?
-
The implementation agencies
are used to execute the works as per the PWD Schedule of
rates. This would not be suitable for works under NREGA, as
the main object here is to provide employment? How would you
evolve norms for preparation of estimates of works and for
measurements?
-
What would you suggest for
ensuring that the workers are not underpaid on the one hand
and there is no corruption on the other?
-
What mechanism would you
suggest to ensure smooth fund flow from National Employment
Guarantee Fund to the gram panchayats?
-
Would it be possible to
have an IT enabled system for release of funds and for
monitoring the implementation? What should be the salient
features of such a system?
-
What would be the best mode
of payment to the persons employed? Through cheque,
adjustment in accounts or cash?
-
Piece rate vs Time rate.
Which should be the preferred mode? What would be the
advantages and disadvantages of adopting each one of them?
-
What methodology should be
used to identify works? How to decide inter-se priority
within the works? Should there be a separate list of works
for women?
-
How to ensure that the
District Schedule of rates is rationally prepared? Should
these be compared across districts?
CAPACITY BUILDING
-
What should be the priority
areas for capacity building? How to prioritize persons in
the community for training purposes?
-
How would you impart
training to the staff employed at all levels in panchayats?
-
Who should conduct capacity
building exercise? Could NGOs be involved in this? Could
this be totally outsourced instead of being carried out by
the Government departments?
-
Should capacity building be
a one time intervention or a continuous process? In the long
run how to make capacity building a part of community
effort?
-
How should the awareness
generation campaigns be designed? Could this be entrusted to
professional agencies?
-
How should the success of
the capacity building effort be measured?
-
What should be the
ingredients of the training programme for the community?
-
What should be the
ingredients of the capacity building programme for the
Government functionaries?
MONITORING AND EVALUATION
-
Should there be a uniform
reporting system for the entire country? If so the
yardsticks and the broad framework may be suggested?
-
How to evaluate the outcome
of the implementation? What parameters/indicators should be
used?
-
What checks and balances are
required if works are executed through the NGOs and SHGs.
-
How to ensure quality of
works executed?
-
How to involve citizens in
monitoring and evaluation?
-
Any other suggestion for
effective implementation of the scheme?
-
What mechanism is suggested
at the Central level to ensure proper utilization of funds
by the State / UT Governments? What mechanism is suggested
at the State / UT level to ensure proper utilization of
funds at the district level?
( Note-
the respondents may furnish any other pertinent
information/suggestion not included in the questionnaire)
4. Questionnaire for implementation of the National Rural
Employment Guarantee Act
(For the President of
Intermediate level Panchayat)
PLANNING
-
So far most of the schemes
were being implemented by the District Panchayat or the
intermediate panchayat. Under NREGA most of the works have
to be implemented by the gram panchayats. What problems do
you foresee in this? What are your suggestions to overcome
these problems?
-
What is the nature of works
that should be taken up under NREGA?
- What
mechanism is suggested to bring about convergence between
the activities under other schemes like Bharat Nirman etc.
and NREGA?
- The
Gram Panchayat has been given the key role in implementation
of NREGA. The size and population of panchayats very widely
from State to State (or UTs) and also within a State (or
UT). Would it be desirable to group the smaller panchayats
into viable and administrative units for the purpose of this
Act?
- How to
ensure that the works included in the shelf of projects or
the once really needed for development of any particular
village? How to work out the priority between works?
IMPLEMENTATION
-
What would be the best mode
of payment to the persons employed? Through cheque,
adjustment in accounts or cash?
-
Should there be a household
identity card or individual identity card?
-
What methodology should be
used to identify works? How to decide inter-se priority
within the works? Should there be a separate list of works
for women?
-
How to ensure that the
selection of eligible persons is fair and doesn’t favour the
influential persons?
-
What should be the role of
the intermediate level in the implementation of the scheme?
Should the gram panchayat be made responsible for
implementation of all works or should the intermediate
level also be given a role in implementation of the Act?
CAPACITY BUILDING
-
Are all elected members of
the panchayats aware about the provisions of the Act?
-
What should be done to make
people aware about their rights under the Act?
-
What should be the priority
areas for capacity building? How to prioritize persons in
the community for training purposes?
-
Who should conduct capacity
building exercise? Could NGOs be involved in this? Could
this be totally outsourced instead of being carried out by
the Government departments?
-
Should capacity building be
a one time intervention or a continuous process? In the long
run how to make capacity building a part of community
effort?
-
How should the awareness
generation campaigns be designed? Could this be entrusted to
professional agencies?
-
How should the success of
the capacity building effort be measured?
-
What should be the
ingredients of the training programme for the community?
-
What should be the
ingredients of the capacity building programme for the
Government functionaries?
MONITORING AND EVALUATION
-
Should there be a uniform
reporting system for the entire country? If so the
yardsticks and the broad framework may be suggested?
-
How to evaluate the outcome
of the implementation? What parameters/indicators should be
used?
-
What checks and balances are
required if works are executed through the NGOs and SHGs.
-
How to ensure quality of the
works executed?
-
How to involve citizens in
monitoring and evaluation?
-
Any other suggestion for
effective implementation of the scheme?
-
What mechanism is suggested
at the Central level to ensure proper utilization of funds
by the State / UT Governments? What mechanism is suggested
at the State / UT level to ensure proper utilization of
funds at the district level?
(note-
the respondents may furnish any other pertinent
information/suggestion not included in the questionnaire)
Questionnaire for implementation of the National Rural
Employment Guarantee Act
(For the President of Gram
Panchayat)
PLANNING
-
How many villages are
included in the Gram Panchayat? What is the total population
in the Gram Panchayat?
-
Does the panchayat have Bank
(Nationalised Bank, Cooperative Bank or Private Bank)?
-
What is the annual budget of
the panchayat for the year 2005-06?
-
Where does the panchayat
keep its money?
-
Does the panchayat have a
post office?
-
What is the staff strength
of the panchayat? How many of these are permanent and how
many are temporary?
-
What are the employment
generation schemes which are being implemented by the
panchayat? {Implementation means full implementation i.e.
identification of works, preparation of estimates,
maintenance of muster rolls and measurement book, and
payment to the workers}.
-
What additional support in
terms of staff would the Panchayat require in order to
implement the NREGA?
-
Is the problem of
unemployment in your village seasonal or throughout the
year?
-
What should be the role of
the intermediate level in the implementation of the scheme?
Should the gram panchayat be made responsible for
implementation of all works or should the intermediate
level also be given a role in implementation of the Act?
- What
mechanism is suggested to bring about convergence between
the activities under other schemes like Bharat Nirman etc.
and NREGA?
- The
Gram Panchayat has been given the key role in implementation
of NREGA. The size and population of panchayats very widely
from State to State (or UTs) and also within a State (or
UT). Would it be desirable to group the smaller panchayats
into viable and administrative units for the purpose of this
Act?
- How to
ensure that the works included in the shelf of projects or
the once really needed for development of any particular
village? How to work out the priority between works?
IMPLEMENTATION
-
NREGA envisages taking up of
durable assets. These may require procurement of materials
like cement, bricks etc. What procedure does the panchayat
follow to procure these materials?
-
Which is better, payment of
wages in terms of foodgrains or cash?
-
What problems are faced by
the gram panchayat in implementing employment generation or
assets creation schemes? What are your suggestions?
-
It is stipulated that the
works have to be identified by the Gram sabhas and
implemented by the village panchayats how would you
prioritize the works?
-
How should the panchayat
monitor the implementation of works and payment of correct
wages to the workers?
-
Is it possible that funds
under NREGA are used for taking up normal works without
fulfilling actual demand for employment. How would you
prevent such diversion of funds?
-
What is the nature of works
that should be taken up under NREGA?
-
What would be the best mode
of payment to the persons employed? Through cheque,
adjustment in accounts or cash?
-
Should there be a household
identity card or individual identity card for the eligible
workers?
-
Piece rate vs Time rate.
Which should be the preferred mode? What would be the
advantages and disadvantages of adopting each one of them?
-
What methodology should be
used to identify works? How to decide inter-se priority
within the works? Should there be a separate list of works
for women?
-
How to ensure that the
selection of eligible persons is fair and doesn’t favour the
influential persons?
-
What checks and balances are
required if works are executed through the NGOs and SHGs.
-
How to ensure quality of
works executed?
CAPACITY BUILDING
-
Are all members of the
panchayat aware about the provisions of the NREGA?
-
How do you plan to increase
the awareness amongst the villagers about the NREGA?
-
What should be the priority
areas for capacity building? How to prioritize persons in
the community for training purposes?
-
Who should conduct capacity
building exercise? Could NGOs be involved in this? Could
this be totally outsourced instead of being carried out by
the Government departments?
-
Should capacity building be
a one time intervention or a continuous process? In the long
run how to make capacity building a part of community
effort?
-
How should the awareness
generation campaigns be designed? Could this be entrusted to
professional agencies?
-
How should the success of
the capacity building effort be measured?
-
What should be the
ingredients of the training programme for the community?
-
What should be the
ingredients of the capacity building programme for the
Government functionaries?
MONITORING AND EVALUATION
-
Should there be a uniform
reporting system for the entire country? If so the
yardsticks and the broad framework may be suggested?
-
How to evaluate the outcome
of the implementation? What parameters/indicators should be
used?
-
How to involve citizens in
monitoring and evaluation?
-
Any other suggestion for
effective implementation of the scheme?
-
What mechanism is suggested
at the Central level to ensure proper utilization of funds
by the State / UT Governments? What mechanism is suggested
at the State / UT level to ensure proper utilization of
funds at the district level?
( Note-
the respondents may furnish any other pertinent
information/suggestion not included in the questionnaire)
6. Questionnaire for implementation of the National Rural
Employment Guarantee Act
(For the NGOs working in the
field of Rural Development)
PLANNING
-
Should the unit of selection
for the implementation of NREGA be a district or a Block?
-
What are the areas in which
NGOs can help in implementation of the scheme?
-
What would you suggest to
bring in total transparency in the implementation of the
Act?
-
What norm should be followed
for distribution of works between gram panchayat, the
intermediate panchayat and the district panchayat?
- What
mechanism is suggested to bring about convergence between
the activities under other schemes like Bharat Nirman etc.
and NREGA?
- The
Gram Panchayat has been given the key role in implementation
of NREGA. The size and population of panchayats very widely
from State to State (or UTs) and also within a State (or
UT). Would it be desirable to group the smaller panchayats
into viable and administrative units for the purpose of this
Act?
- How to
ensure that the works included in the shelf of projects or
the once really needed for development of any particular
village? How to work out the priority between works?
IMPLEMENTATION
-
How to ensure that fair
wages are paid to the workers? What would be the best mode
of payment to the persons employed? Through cheque,
adjustment in accounts or cash?
-
What should be the role of
the intermediate level in the implementation of the scheme?
Should the gram panchayat be made responsible for
implementation of all works or should the intermediate level
also be given a role in implementation of the Act?
-
Should there be a household
identity card or individual identity card?
-
What is the nature of works
that should be taken up under NREGA?
-
Piece rate vs Time rate.
Which should be the preferred mode? What would be the
advantages and disadvantages of adopting each one of them?
-
What methodology should be
used to identify works? How to decide inter-se priority
within the works? Should there be a separate list of works
for women?
-
What should be the mechanism
for payment of Unemployment allowance?
-
How to ensure that the
selection of eligible persons is fair and doesn’t favour the
influential persons?
-
What checks and balances are
required if works are executed through the NGOs and SHGs.
-
How to ensure that the
District Schedule of rates is rationally prepared? Should
these be compared across districts?
-
How to ensure quality of
works executed?
CAPACITY BUILDING
-
What should be the priority
areas for capacity building? How to prioritize persons in
the community for training purposes?
-
Who should conduct capacity
building exercise? Could NGOs be involved in this? Could
this be totally outsourced instead of being carried out by
the Government departments?
-
Should capacity building be
a one time intervention or a continuous process? In the long
run how to make capacity building a part of community
effort?
-
How should the awareness
generation campaigns be designed? Could this be entrusted to
professional agencies?
-
How should the success of
the capacity building effort be measured?
-
What should be the
ingredients of the training programme for the community?
-
What should be the
ingredients of the capacity building programme for the
Government functionaries?
MONITORING AND EVALUATION
-
Should there be a uniform
reporting system for the entire country? If so the
yardsticks and the broad framework may be suggested?
-
How to evaluate the outcome
of the implementation? What parameters/indicators should be
used?
-
How to involve citizens in
monitoring and evaluation?
-
Any other suggestion for
effective implementation of the scheme?
-
What mechanism is suggested
at the Central level to ensure proper utilization of funds
by the State / UT Governments? What mechanism is suggested
at the State / UT level to ensure proper utilization of
funds at the district level?
( Note-
the respondents may furnish any other pertinent
information/suggestion not included in the questionnaire)
7. Questionnaire for implementation of the National Rural
Employment Guarantee Act
(For the Collector, where
Panchayats have not been constituted)
PLANNING
-
Should the unit of selection
for the implementation of NREGA be a district or a Block?
-
Please furnish information
about your district in the following format:
Name of
District: Total rural population:
|
S.No. |
Name of Block |
No. of local councils |
No. of local councils
havings banks |
No. of local councils
having a post office |
No. of local councils
having internet connectivity |
|
|
|
|
|
|
|
-
What is the implementation
mechanism proposed for the implementation of the Act?
{including release of funds and monitoring}.
-
Do all the village councils
have a bank account? If not, how are funds released to them?
-
Were these village councils
implementing employment generation schemes earlier?
-
What is the supervisory
mechanism for the village councils?
- What
mechanism is suggested to bring about convergence between
the activities under other schemes like Bharat Nirman etc.
and NREGA?
- The
Gram Panchayat has been given the key role in implementation
of NREGA. The size and population of panchayats very widely
from State to State (or UTs) and also within a State (or
UT). Would it be desirable to group the smaller panchayats
into viable and administrative units for the purpose of this
Act?
- How to
ensure that the works included in the shelf of projects or
the once really needed for development of any particular
village? How to work out the priority between works?
IMPLEMENTATION
-
What methodology should be
used to identify works? How to decide inter-se priority
within the works? Should there be a separate list of works
for women?
-
How to ensure that the
selection of eligible persons is fair and doesn’t favour the
influential persons?
-
What checks and balances are
required if works are executed through the NGOs and SHGs.
-
How to ensure quality of
works executed?
-
How to ensure that the
District Schedule of rates is rationally prepared? Should
these be compared across districts?
CAPACITY BUILDING
-
What should be the priority
areas for capacity building? How to prioritize persons in
the community for training purposes?
-
Who should conduct capacity
building exercise? Could NGOs be involved in this? Could
this be totally outsourced instead of being carried out by
the Government departments?
-
Should capacity building be
a one time intervention or a continuous process? In the long
run how to make capacity building a part of community
effort?
-
How should the awareness
generation campaigns be designed? Could this be entrusted to
professional agencies?
-
How should the success of
the capacity building effort be measured?
-
What should be the
ingredients of the training programme for the community?
-
What should be the
ingredients of the capacity building programme for the
Government functionaries?
MONITORING AND EVALUATION
-
Which agency/agencies should
be responsible for monitoring?
-
Should there be a uniform
reporting system for the entire country? If so the
yardsticks and the broad framework may be suggested?
-
How to evaluate the outcome
of the implementation? What parameters/indicators should be
used?
-
How to involve citizens in
monitoring and evaluation?
-
Any other suggestion for
effective implementation of the scheme?
-
What mechanism is suggested
at the Central level to ensure proper utilization of funds
by the State / UT Governments? What mechanism is suggested
at the State / UT level to ensure proper utilization of
funds at the district level?
(
Note- the
respondents may furnish any other pertinent
information/suggestion not included in the questionnaire
|